Tools

Home > Products > Tools > Parker X164PLP-6 Connector
Parker X164PLP-6 Connector
[pics:title]

Parker X164PLP-6 Connector

Date: 2025-05-07
Brand: Parker
Models: X164PLP-6
Price: Phone or Email Inquiry

Do you have any questions about this product? Please contact our customer service by phone number +852 30623028 Or Quick Inquiry Form.

Product Overview

Parker X164PLP-6 Connector 

Push-to-Connect Nickel Plated Instant Fittings

Technical Specifications

Connection 3 Size:3/8"
Connection 2 Type:Push-to-Connect
Connection 2 Size:3/8"
Connection 1 Type:Push-to-Connect
Connection 1 Size:3/8"
Configuration:Tube to Tube
Connection 3 Type:Push-to-Connect
Hex Size:n/a
Industry:Automotive, Industrial Manufacturing Equipment, Material Handling, Semiconductor
Tube Material:Polyethylene, Polypropylene, Nylon, Rigid Nylon, Polyurethane 90 to 95 Durometer Shore A
Brand:Parker
Maximum Operating Temperature:200 °F, 93.3 °C
Minimum Operating Temperature:0 °F, -17.7 °C
Maximum Operating Pressure:300 psi, 20.6 bar
Application:Automotive, Packaging, Air Lines, Inert Gases, Oil Lines, Vacuum
Technology:Fluid & Gas Handling, Pneumatics
Vacuum Pressure Rating:28 inch-Hg
Division:Fluid System Connectors Division
Body Material:Brass, Nickel-plated
Gripping Ring Material:Stainless Steel
Region of Origin:United States
Specifications Met:UL 94 V-0
Seal Material:Nitrile
For Fluid Type:Air, Oil, Inert Gases
Materials of Construction:PVDF (Button)
Shape:Union Tee

Being the world’s leader in push-to-connect fitting technology Parker’s Prestolok PLP nickel plated brass fittings provide a simple way of connecting tubes to a fitting in order to create a fluid distribution network. Prestolok PLP push in metal fittings reduce assembly time by eliminating the use of a sleeve and tightening of a nut required in compression style fittings. Simply push the tubing into the fitting until it bottoms. To disassemble, press the release button, hold against the body and pull tubing from the fitting. A thread sealant is applied to all male threads eliminating the possibility of system contamination from PTFE tape.



Our order process

Step One

Customer inquiry

Step Two

Cost calculation and quotation preparation

Step Three

Quotation submission to the customer

Step Four

Contract signing and advance payment

Step Five

Product arrival and final payment

Step Six

Shipment to the customer