Flow

Home > Products > Flow > Gems FS-4 118424 Flow Switch FS-4 Series
Gems FS-4 118424 Flow Switch FS-4 Series
[pics:title]

Gems FS-4 118424 Flow Switch FS-4 Series

Date: 2025-03-26
Brand: Gems
Models: FS-4 118424
Price: Phone or Email Inquiry

Do you have any questions about this product? Please contact our customer service by phone number +852 30623028 Or Quick Inquiry Form.

Product Overview

Gems FS-4 118424 Flow Switch FS-4 Series

FS-4 Series Flow Switches make flow protection economical for a broad range of industrial applications such as welders, lubrication systems, medical sterilizers and laundry chemicals dispensing. Applications include: Electronic Equipment (Laser Heads, Welders, Power Supplies, High Speed Spindles, X-Ray Tubes, Semiconductor Equipment), Bearings or Gears (Presses, Rotating Equipment, Conveyors, Machine Tools, Robotics), Processing & Dispensing Equipment (Water Purifications and Filtering, X-Ray Film Processing, Beverage Dispensing, Chemical Additives, Gas Sampling, Distilling).

  • Flow Rate Settings: 0.1 GPM to 1.5 GPM

  • Port Size: 9/16" - 18 UNF

  • Primary Construction Material: Ryton

  • Setting Type: Fixed

  • More robust porting hubs offer better structural integrity

  • Molded cable grommet offers improved moisture protection


ModelDescriptionFlow Setpoint Range
(Fixed GPM)
FS-380Compact, Piston-Type, High Inline Pressures0.15-2.00
FS380-PIndustrial Strength, Inline, Piston-Type, Plastic0.07-2.00
FS-480Stainless Steel, Piston-Type, Large Flow, Low Pressure Drop0.50-3.00
FS-200**General Purpose, Shuttle-Type, Straight-Through Flow Path0.50-50.00
RFS*Rotorflow® Paddle Wheel-Type with Visual Indication0.10-60.00
FS-925Compact, Piston-Type, Liquid or Gas0.10-1.50
FS-926
Compact, Piston-Type, Low Flow, Liquid or Gas.013-.075
FS-927
Miniature (1” x 2.75”), Piston-Type0.10-1.50
FS-4
Piston-Type, Molded Ryton, SPST or SPDT 0.10-1.50
0.10-1.50
FS-150
Piston-Type, Quick Disconnect, Low Pressure Drop0.50-5.00
FS-500
Shuttle-Type, 90°, For Plastic Piping0.25-5.00


Our order process

Step One

Customer inquiry

Step Two

Cost calculation and quotation preparation

Step Three

Quotation submission to the customer

Step Four

Contract signing and advance payment

Step Five

Product arrival and final payment

Step Six

Shipment to the customer