​Filters & Coolers

Home > Products > ​Filters & Coolers > Rübsamen & Herr Control Cabinet Filter Fan LV 410
Rübsamen & Herr Control Cabinet Filter Fan LV 410
[pics:title]

Rübsamen & Herr Control Cabinet Filter Fan LV 410

Date: 2026-11-26
Models: LV 410
Price: Phone or Email Inquiry

Do you have any questions about this product? Please contact our customer service by phone number +852 30623028 Or Quick Inquiry Form.

Product Overview

The Rübsamen & Herr LV 410 is a compact filter fan set for forced ventilation of control cabinets and enclosures. Mounted in a 223 x 223 mm panel cut-out, it draws filtered ambient air into the cabinet and expels heated air through a matching GV exhaust filter, keeping components within their operating temperature range. The set is delivered complete with filter mat and gasket and is available in blowing or sucking direction, with 230 V AC / 24 V DC / 115 V AC.

Key Features

  • Compact filter fan set for control cabinet and enclosure ventilation
  • Supplied complete with filter mat and gasket, ready to install
  • Available blowing (into the cabinet) or sucking (out of the cabinet)
  • Voltage variants: 230 V AC, 24 V DC or 115 V AC depending on version
  • Light grey RAL 7035 housing
  • Matching GV exhaust filter available as a paired outlet unit

Technical Specifications

ParameterValue
Air flow, free-blowing250 / 290 m³/h
Air flow, with exhaust filter205 / 230 m³/h
Panel cut-out223 x 223 mm
Outer dimensions250 x 250 mm
Installation depth120 mm
Filter matP15/350S
Matching exhaust filterGV 400/500
Voltage options230 V AC / 24 V DC / 115 V AC
Housing colourLight grey RAL 7035

The set is delivered complete with filter mat and seal, and pairs with a matching GV-series exhaust filter on the opposite panel for through-flow cabinet cooling. EFFSEN supplies the full Rübsamen & Herr enclosure climate line with fast delivery and global shipping.

Our order process

Step One

Customer inquiry

Step Two

Cost calculation and quotation preparation

Step Three

Quotation submission to the customer

Step Four

Contract signing and advance payment

Step Five

Product arrival and final payment

Step Six

Shipment to the customer