valve

Home > Products > valve > Festo GRLA-1/4-QS-6-RS-D One-way Flow Control Valve
Festo GRLA-1/4-QS-6-RS-D One-way Flow Control Valve
[pics:title]

Festo GRLA-1/4-QS-6-RS-D One-way Flow Control Valve

Date: 2025-05-16
Brand: Festo
Models: GRLA-1/4-QS-6-RS-D
Price: Phone or Email Inquiry

Do you have any questions about this product? Please contact our customer service by phone number +852 30623028 Or Quick Inquiry Form.

Product Overview

Festo GRLA-1/4-QS-6-RS-D One-way Flow Control Valve

Core Features

Product Type:

One-Way Flow Control Valve, used to adjust the one-way air flow speed of pneumatic actuators (such as cylinders) to control the movement speed.

Two-way throttling function is optional (need to confirm the specific model).

Interface Specifications:

Interface Size: 1/4 Inch (G1/4)

Flow Adjustment Range: 0.05~6 L/min (Typical Value, Suitable for Small and Medium-sized Cylinders).

Flow Control Characteristics:

One-Way Throttling: Only restricts air flow in one direction (usually used for cylinder exhaust throttling to achieve smooth movement).

Adjustable: Adjust the flow rate by knob or screwdriver (with scale indication).

High Precision: Stable flow control and reduced actuator jitter.

Material and Design:

Valve Body Material: Brass (nickel-plated for rust prevention) or engineering plastic (chemical corrosion resistance).

Seal Ring: NBR (standard) or FKM (high temperature/oil resistant).

Installation Method: Pipe Installation (direct access to the gas line) or Panel Installation (optional).

Working parameters:

Working pressure: 0.2~10 bar (standard type).

Temperature range: -10°C ~ +60°C (standard sealing material).

Special functions (optional):

With locking function: prevents accidental adjustment (e.g. in vibrating environments).

Quick exhaust (Quick-Speed, QS model): optimizes cylinder response speed.


Our order process

Step One

Customer inquiry

Step Two

Cost calculation and quotation preparation

Step Three

Quotation submission to the customer

Step Four

Contract signing and advance payment

Step Five

Product arrival and final payment

Step Six

Shipment to the customer